Summary of 2003 Ridge and Indian River-South Florida Citrus Caretaker Surveys
Click here to view a PDF version of this document.
Home Search What's New Products Survey Help
Summary of 2003 Ridge and Indian River-South Florida Citrus Caretaker Surveys

   

Summary of 2003 Ridge and Indian River-South Florida Citrus Caretaker Surveys1

Ronald P. Muraro2

This year's annual questionnaire surveys were conducted through the mail from February through April 2003. Thirty citrus caretakers participated in the Ridge area survey, while twenty-two citrus caretakers participated in the Indian River-South Florida area survey. Cooperatives, their members, and growers performing their own cultural practies were not surveyed. The author expresses sincere thanks to those caretakers and their staffs who took time from their busy schedules to report their custom charges.

Caretakers answering the Ridge survey reported servicing 62,709 acres planted to citrus, or 2,639 acres per caretaker. The Indian River-South Florida participants serviced 45,150 total acres, or 3,225 acres per caretaker. A majority of the Indian River-South Florida growers conduct their own cultural practices. Also, during the past two years, there has been a consolidation among citrus caretaker firms, along with citrus grove acreage, resulting in fewer citrus caretakers participating in the annual survey.

The 2003 survey custom rates, which are the most current available, are itemized as low, high, and average (Tables 1 and 2 ). During the past three years, more citrus caretakers have been reporting the use of electronic sensing technology as shown in the Spraying section on the 2003 summary of the citrus caretarker surveys. Custom rates for growers who are members of cooperatives and costs for growers who conduct their own cultural practices may differ from these average caretaker rates. For more detailed information on customer rates and other citrus production cost data for 2002-2003 and previous years, contact either the author or your local County Extension Citrus Specialist, or go to the "Economics" section of the UF/IFAS CREC website at http://www.lal.ufl.edu .

Tables

Table 1. A listing of 2003 custom rates reported by 30 Ridge citrus caretakers.

Grove Practice


Unit

Low Rate

High Rate

Average Ratey

Comments


CULTIVATION AND EQUIPMENT




Hand Labor


Hour

$ 10.00

$ 15.00

$ 12.35

Plus transportation

Mechanical Labor


Hour

25.00

42.50

31.85

Includes truck

Rotovate


Hour


28.00

45.00

35.69



Disc 7 feet


Hour

26.00

35.00

30.09



Disc 7 feet


Acre

8.00

12.00

10.00

One-way discing



Disc 9-10 feet


Hour

28.00

40.00

33.00



Disc 9-10 feet


Acre

8.00

11.25

9.21

One-way discing



Chop


Hour

26.70

40.00

31.43



Chop
Acre

7.00

10.00

8.68



Mow 5-7 feet


Hour

28.00

35.00

30.17



Mow 9-12 feet


Hour

32.00

36.50

35.33

3 data points

Mow 5-7 feet


Acre

8.50

11.25

10.31



Mow 9-12 feet


Acre

9.50

13.50

10.91



Mow 15-16 feet


Acre


10.00

12.50

11.25



Herbicide (strip/

band single boom)z


Hour

26.40

33.00

29.48

Plus materials



Herbicide (strip/ band single boom)z


Acre

11.50

15.00

13.98

Plus materials



Herbicide (strip/ band double boom)z


Acre

12.50

15.70

13.81

Plus materials; $36.50/hour average



Herbicide (piggy-back

appliance)z


Acre

12.50

17.50

14.50

Plus materials

Herbicide

(chemical mow)z


Acre


5.00

9.25

7.32

Plus materials



Temikz


Acre

13.00

15.00

14.26

Plus materials



Plow


Hour

30.00

35.00

33.38



Deviner


Hour

--

--

30.00



Bush Hog


Hour

28.00

41.00

34.23



Pickup Truck

w/ Driver


Hour

22.50

35.00

26.37

27,353 miles/year average



Flatbed Transport

Truck w/ Driver


Hour

28.00

40.00

33.03

27,639/miles/year average;

$17.83/hour average w/o driver



Low-Boy Transport


Hour

50.00

55.00

52.25



Tractor w/ Driver


Hour

25.00

32.50

27.88



Water/Supply

Truck


Hour

25.00

34.25

29.38


SPRAYINGz




Engine-Driven Air Blast Sprayer


$140/tank @ 250 GPA (1,000 gallon tank)



Engine-Driven PTO Air Blast Sprayer


$21/acre @ 125 GPA



AIR BLAST SPRAYER







1,000 Gallon Tank

Engine-Driven


1,000 Gallon Tank

PTO-Powered


Electronic Sensing Technology


500 GPA


Acre

35.00

35.25

35.08


25.00

35.00

31.30


$32.60/acre


250 GPA


Acre

25.00

35.00

28.65


25.00

32.00

28.80


$29.75/acre


125 GPA


Acre

--

--

--


21.00

27.00

23.13


$27.50/acre


100 GPA


Acre


--

--

--


20.00

23.00

21.33


$23.50/acre


50 GPA


Acre

--

--

--


15.00

20.00

18.83


$20.00/acre


Aerial (Bell-47 helicopter)


$10.00 @ 5 GPA; $15.00 @ 10 GPA; $17.50 @ 15 GPA;

$22.00 @ 20 GPA


FERTILIZINGz




Inject Liquid Fertilizer into Irrigation System


Hour

25.00

35.00

31.03

Truck plus labor



Inject Liquid Fertilizer into Irrigation System
Acre

1.50

3.50

2.69

$58.06/irrigation injection hookup



Liquid Boom Application

(double boom)


Acre

12.00

15.00

13.86

$17.50/acre average per single boom



Dry (bulk)


Acre

7.00

10.50

8.71

$30.20/hour



Lime or Dolomite


Acre

7.50

10.75

8.80



Lime or Dolomite


Ton

7.00

10.50

8.03



Fertilize Treesz








Hand spread


Hour

10.00

15.00

12.35

Plus transportation and materials

Machine spread


Hour

25.00

35.00

30.50

Plus materials; $7.76/acre


IRRIGATION




Microsprinkler


$3.48/acre, $37.50/month, $18.00/trip


Start/stop & supervision



Microsprinkler


Hour

25.00

35.00

27.60

Start/stop & supervison

(truck & driver)



ATV w/ Driver


Hour

15.00

25.00

20.65

Check/repair microsprinkler

irrigation system



Ring Young Trees








Hand labor
Hour

10.00

15.00

12.35

Plus transportation



Mechanical
Hour

24.20

28.50

25.93

Labor plus equipment
REMOVING TREES




Tree Shearing (cutting trees at ground level)


Hour

50.00

65.00

60.17

5-20 trees/hour to shear trees



Front-End Loader


Hour

50.00

60.00

54.19

5-20 trees/hours to remove trees



Bulldozer


Hour

--

--

50.00



Front-End Loader

w/ Tree Spade


Hour

--

--

65.00


PRUNING




General Pruning

(Rehab)


Tree

3.00

5.00

3.81

Depends on trees/acre

Power Saw

w/ Operator


Hour

17.00

25.00

20.50

Plus transportation

Limb Lifter/Tree Skirt Timmer

(double sided)


Hour

--

--

200.00

9-18 acres per one pass

Hedging








Single side

(tractor mounted)


Hour

75.00

80.00

76.67

2-5 acres/hour

Double side

(tractor pulled)


Hour

80.00

100.00

86.88

3-5 acres/hour

Double side

(tractor mounted)


Hour

200.00

220.00

210.00



Double side

(self propelled)x


Hour

325.00

360.00

341.67

10-25 acres/hour,



Double Side

(self propelled)x


Hour


250.00

300.00

287.50

4-12 acres/hour,



Topping








Tractor mounted


Hour


195.00

200.00

196.67



Tractor pulled


Hour

--

--

100.00

1-3 acres/hour

Self propelled


Hour

365.00

380.00

372.50

5-10 acres/hour (roof top)

5-20 acres/hour (flat top)



Double boom

(self propelled)


Hour

--

--

550.00

2-12 acres/hour (roof top)

15-30 acres/hour (flat top)



Removing Brush








Haul brush from

grove


Hour

35.00

40.50

37.10

4 people with truck/tractor-trailer



Front-end loader

(push brush)


Hour

46.40

60.00

53.72

2-10 acres/hour

Chop/mow brush


Hour

27.90

37.50

33.42

3-6 acres/hour, $11.31/acre average


COLD PROTECTION




Mechanical


Hour

--

--

23.43



Install Wraps


Hour

0.24

0.50

0.34


OTHER CUSTOM RATES




Plant Trees

(resets)


Tree

1.75

3.00

2.38

Stake, plant, and first watering

Plant Trees

(solid set)


Tree

1.00

1.50

1.19

Stake, plant, and first watering

Travel/Set-Up Charge


Hour

--

--

27.00

Reporting average

Grove Management Charge/Month





Supervising grove

care operations


Acre

1.50

5.50

2.88

In addition to caretaking charges



Handling fruit

marketing


Box


0.10

0.25

0.15

6% equipment labor charge;

$50/acre annually



Personnel charges for harvesting

operations & maintaining labor

compliance records


$0.16/box average



Consulting
$50-$100/hour (cultural management/horticultural evaluation)

$150/hour (financial analysis prospectus)



Total Reported Acreage Provided Grove




Service to


Acre

350

14,415

2,639

62,709 acres total



Source: Ronald P. Muraro, professor, Citrus Research and Education Center, Lake Alfred, FL. June 2003.

x Low acres = two years regrowth hedging; high acres = annual maintenance hedging.

y Calculated by dividing total number of caretakers reporting a grove practice rate into sum reported.

Unless otherwise stated, labor included with all charges.

z Plus materials. Caretakers reporting rates include labor, tractor, and sprayer. Supply truck included

by most caretakers.


Table 2. A listing of 2003 custom rates reported by 22 Indian River and South Florida citrus caretakers.

Grove Practice


Unit

Low Rate

High Rate

Average Ratey

Comments


CULTIVATION AND EQUIPMENT




Hand Labor


Hour


$ 11.00

$ 15.00

$ 12.92

Plus transportation and equipment

Mechanic Labor


Hour

30.00

40.00

34.48

Labor and service truck



Rotovate


Hour

30.00

40.00

35.94



Disc 7-8 feet


Hour

26.00

37.50

31.32



Disc 9-10 feet


Hour

32.25

37.50

34.35



Mow 7-8 feet


Hour

30.00

33.00

30.66



Mow 9-10 feet


Hour

30.00

37.50

32.93



Mow 9-10 feet


Acre

9.00

11.00

9.72



Mow 15-16 feet


Hour

35.00

40.00

37.79

$8.75/acre average



V-Mower


Hour

30.00

34.00

31.56

$8.87/acre average



Sickle Mower


Hour

--

--

34.00



Herbicide (strip/ band single boom)z


Hour

32.00

38.00

35.00



Herbicide (strip/ band single boom)z


Acre

12.00

13.40

12.69

Plus materials

Herbicide (strip/ band double boom)z


Acre

11.50

13.00

12.25

Plus materials



Herbicide (chemical mow)z


Acre


2.50

7.00

4.00

Plus materials

Temikz


Acre

10.00

13.00

11.83

Plus materials

Plow


Hour

30.00

37.50

33.33



Backhoe


Hour

40.00

50.00

46.28



Vine Puller/Deviner


Hour


30.00

31.00

30.33



Middle Buster


Hour

30.00

37.50

34.13

With tractor and driver; $0.025/foot



Mound Builder


Hour

33.00

37.50

34.50

With tractor and driver; $0.25/mound

Grader Blade
Hour

28.00

37.50

33.00

With tractor/blade and driver

Caterpillar Grader


Hour

--

--

55.00



Bush Hog


Hour

35.00

41.00

37.83



Water Truck

w/ Driver


Hour


30.00

35.00

33.04



Pickup Truck

w/ Driver


Hour

24.00

35.00

38.78

24,990 miles/year average



Flatbed/Transport

Truck w/Driver


Hour

35.00

50.00

35.70

12,115 miles/year average



Tractor w/ Driver


Hour

27.50

40.00

30.73



ATV w/ Driver


Hour

18.00

25.00

21.70


SPRAYINGz






PTO AIR BLAST SPRAYER






1,000 Gallon Trank

with

Electronic Sensing


1,000 Gallon Tank

without

Electronic Sensing


500 Gallon Tank Engine Driven Average


500 GPA


Acre

35.00

40.00

37.75


30.00

35.00

34.70


37.77


250 GPA


Acre

28.00

35.00

31.20


25.00

30.00

28.50


30.38


125 GPA


Acre

23.00

27.50

25.38


23.50

25.00

23.93


26.02


100 GPA


Acre

--

--

--


19.75

21.00

20.42


--


Curtec (25 GPA)


Acre


20.00

20.00

20.67






Aerial


Fixed Wing $4.93/acre @ 5 GPA (GPA = gallons per acre)



Aerial


Fixed Wing $6.07/acre @ 10 GPA; Huey Helicopter $15.00/acre @ 10 GPA



Aerial


Fixed Wing $7.55/acre @ 15 GPA; Huey Helicopter $30.00/acre @ 15 GPA



Aerial


Fixed Wing $11.02/acre @ 20 GPA


FERTILIZINGz




Liquid Boom Application




Single boom


Acre

--

--

12.50



Double boom


Acre

--

--

12.25



Dry (bulk)


Acre


7.00

8.25

7.02

$12.00/acre with electronic sensing

technology



Lime or Dolomite


Acre

7.00

8.25

7.63

$34.13 (includes materials)



Fertilize Treesz








Hand spread


Hour

11.00

15.00

12.92

Plus transportation and materials

Machine spread


Hour

26.00

33.00

29.80

Plus materials; $7.25/acre average;

$12.00/acre with electronic sensing


IRRIGATION




Ditch Mower


Hour


35.00

45.00

41.00



Water Furrow Disc


Hour

30.00

37.50

34.10



Water Furrow Cleaner
Hour

33.00

34.00

33.33



Water Furrow Shaper

(non-laser)


Hour

35.00

42.00

38.11



Water Furrow Shaper

(laser control)


Hour


70.00

75.00

72.67



Rotary Ditcher

or Auger


Hour


30.00

37.50

34.63



Micropsprinrkler/

Drip Irrigation Maintenance


Acre


3.50

4.50

3.85

Monthly charges.

Check and repair system; parts extra



Microsprinkler


$28.75/setting; $32.33/hour

(truck & driver)


Start/stop and supervison


REMOVING TREES




Front-End Loader


Hour

50.00

57.20

52.53

3-15 trees/hour average

Tree Shearing (cutting trees at ground level)


Hour

50.00

60.00

54.29

5-20 trees/hour average


PRUNING




Power Saw

w/ Operator


Hour

17.00

21.50

19.81



Hedging








Double side

(tractor-pulled)


Hour

100.00

145.00

130.00

6-10 acres/hour

Double side

(tractor

mounted)


Hour


--

--

200.00



Double side

(self propelled)


Hour

225.00

265.00

255.00

8-20 acres/hour, $14.07/acre average



Double side

rotary boom

(self propelled)x


Hour

--

--

300.00

5-15 acres/hour (bed top only),

add 25% for furrows only



Double side

self propelled

fixed boom

hedgerx


Hour

--

--

360.00

12-30 acres/hour (bed top only)

8-20 acres/hour (bed top and furrow)



Topping








Tractor pulled


Hour

--

--

115.00

2-5 acres/hour



Tractor pulled

(fixed boom)


Hour

--

--

360.00

5-12 acres/hour (roof top)

10-20 acres/hour (flat top)



Double side

topper (self

propelled)


Hour

265.00

300.00

279.00

8-15 acres/hour, $25/acre average



Double boom

(self propelled)


Hour

--

--

550.00

15-30 acres/hour (flat top)

Limb Lifter/

Tree Skirt

Trimmer


Acre

--

--

13.00

3-5 acres/hour

Limb Lifter/

Tree Skirt

Trimmer

(double-side

rotary)


Hour

--

--

130.00

6-20 acres/hour

Removing Brush








Remove brush

w/ front-end

loader


Hour


50.00

55.00

51.14

$8.00/acre average

Chop/mow

brush


Hour


32.00

40.00

36.58


OTHER CUSTOM RATES




Install Tree Wraps


$0.15-$0.45 per tree, depending on wrap & trees; $0.25/tree maintenance



Plant Trees

(solid set)


Tree

0.90

1.50

1.15

Varies as to density

Plant Trees

(resets)


Tree


2.00

3.25

2.31

Varies as to the number of resets

Travel/Setup Charge
Hour

--

--

25.23



Grove Management Charge/Month






Supervising

grove care

operations


Acre

3.00

5.75

4.29

In addition to caretaking charges

Handling fruit marketing


$0.10-$0.25/box for supervising & marketing fruit



Chemical/fertilizer management


10-20% of materials cost



Personnel charges for harvesting

operations & maintaining labor

compliance records


$0.10-$0.18/box



Consulting


$85.00-$200.00/hour Cultural Management/Horticultural Evaluation

and or Financial Analysis Prospectus



Total Reported Acreage Provided Grove




Service to


Acre

1,400

8,000

3,225

45,150 total acres



Source: Ronald P. Muraro, professor, University of Florida, Citrus Research and Education Center, Lake Alfred, FL, June 2003.

x Low acres = two years regrowth hedging; high acres = annual maintenance hedging.

y Calculated by dividing total caretakers reporting a grove practice rate into sum reported. Unless

otherwise stated, labor included with all charges.

z Plus materials. Caretakers reporting rates include labor, tractor, and sprayer. Supply truck included

by most caretakers.



Footnotes

1. This is EDIS document FE 429, a publication of the Department of Food and Resource Economics, Florida Cooperative Extension Service, UF/IFAS, University of Florida, Gainesville, FL. Published October 2003. Please visit the EDIS website at http://edis.ifas.ufl.edu.

2. Ronald P. Muraro, Professor and Farm Management Economist, Department of Food and Resource Economics, Citrus Research and Education Center, Lake Alfred, FL, Florida Cooperative Extension Service, UF/IFAS, University of Florida, Gainesville, FL.


The Institute of Food and Agricultural Sciences (IFAS) is an Equal Opportunity Institution authorized to provide research, educational information and other services only to individuals and institutions that function with non-discrimination with respect to race, creed, color, religion, age, disability, sex, sexual orientation, marital status, national origin, political opinions or affiliations. For more information on obtaining other extension publications, contact your county Cooperative Extension service.

U.S. Department of Agriculture, Cooperative Extension Service, University of Florida, IFAS, Florida A. & M. University Cooperative Extension Program, and Boards of County Commissioners Cooperating. Larry Arrington, Dean.



Copyright Information

This document is copyrighted by the University of Florida, Institute of Food and Agricultural Sciences (UF/IFAS) for the people of the State of Florida. UF/IFAS retains all rights under all conventions, but permits free reproduction by all agents and offices of the Cooperative Extension Service and the people of the State of Florida. Permission is granted to others to use these materials in part or in full for educational purposes, provided that full credit is given to the UF/IFAS, citing the publication, its source, and date of publication.