University of FloridaSolutions for Your Life

Download PDF 
Publication #

Summary of 2002 Ridge and Indian River-South Florida Citrus Caretaker Surveys1

Ronald P. Muraro2

This year's annual questionnaire surveys were conducted through the mail from February through April 2002. Thirty citrus caretakers participated in the Ridge area survey, while 22 citrus caretakers participated in the Indian River–South Florida area survey. Cooperatives, their members, and growers performing their own cultural practies were not surveyed. The author expresses sincere thanks to those caretakers and their staffs who took time from their busy schedules to report their custom charges.

Caretakers answering the Ridge survey reported servicing 60,708 acres planted to citrus, or 2,639 acres per caretaker. The Indian River–South Florida participants serviced 44,602 total acres, or 3,431 acres per caretaker. A majority of the Indian River–South Florida growers conduct their own cultural practices. Also, during the past two years, there has been a consolidation among citrus caretaker firms, along with citrus grove acreage, resulting in fewer citrus caretakers participating in the annual survey.

The itemized custom rates, expressed as the low and high rate reported, and the average of the rates for the 2002 surveys are the most current available (Tables 1 and 2). Custom rates for growers who are members of cooperatives and costs for growers who conduct their own cultural practices may differ from these average caretaker rates. For more detailed information on customer rates and other citrus production cost data for 2001-2002 and previous years, contact either the author or your local County Extension Citrus Specialist.

Tables

Table 1. 

A listing of 2002 custom rates reported by 30 Ridge citrus caretakers.

Grove Practice

Unit

Range of Rate Reported

Average Ratey

Comments

CULTIVATION AND EQUIPMENT

Hand Labor

Hour

$ 10.00

$ 15.00

$ 12.13

Plus transportation

Mechanic Labor

Hour

25.00

40.00

30.82

Includes truck

Rotovate

Hour

26.70

41.60

32.74

Disc 7 feet

Hour

25.00

35.00

29.81

Disc 7 feet

Acre

8.00

10.00

9.09

One-way discing

Disc 9-10 feet

Hour

25.00

35.60

30.47

Disc 9-10 feet

Acre

7.00

10.00

8.98

One-way discing

Chop

Hour

26.00

35.80

28.86

Mow 5-7 feet

Hour

27.90

35.60

30.76

Mow 9-12 feet

Hour

29.60

35.00

32.03

Mow 5-7 feet

Acre

8.50

11.25

10.19

Mow 9-12 feet

Acre

10.00

12.50

10.75

Mow 15-16 feet

Acre

10.00

12.00

11.33

Herbicide (strip/

band single boom)z

Hour

26.40

33.00

29.73

Plus materials

Herbicide (strip/ band single boom)z

Acre

11.00

15.00

13.58

Plus materials

Herbicide (strip/ band double boom)z

Acre

12.50

15.00

13.57

Plus materials; $35.26/hour average

Herbicide (piggy-back

appliance)z

Acre

12.50

17.50

14.82

Plus materials

Herbicide

(chemical mow)z

Acre

5.00

8.50

7.14

Plus materials

Temikz

Acre

12.00

15.00

13.90

Plus materials;

fumigate @ $7.50/acre

Plow

Hour

29.00

35.00

30.14

Deviner

Hour

30.00

Bush Hog

Hour

27.50

40.50

33.07

Pickup Truck

w/ Driver

Hour

22.50

35.00

27.19

24,411 miles/year/pickup average

Flatbed Transport

Truck w/ Driver

Hour

29.00

40.00

34.17

27,917/miles/year average;

$87.50/trip average

Low-Boy Transport

Hour

50.00

65.00

56.25

Tractor w/ Driver

Hour

24.20

32.00

28.10

Water/Supply

Truck

Hour

27.50

35.00

30.35

SPRAYINGz

Engine-Driven Air Blast Sprayer

$140/tank @ 250 GPA (1,000 gallon tank)

Engine-Driven PTO Air Blast Sprayer

$21/acre @ 125 GPA

AIR BLAST SPRAYER

Engine-Driven

PTO-Powered

Tree See Technology

500 GPA

Acre

30.00

36.00

33.67

25.00

35.75

30.19

$30.20/acre

250 GPA

Acre

24.00

33.50

28.68

25.00

30.00

27.50

$27.50/acre

125 GPA

Acre

18.00

26.00

21.63

$25.00/acre

100 GPA

Acre

17.50

20.00

19.17

$22.50/acre

50 GPA

Acre

15.00

20.00

18.33

$20.00/acre

Aerial (Bell-47 helicopter)

$10.00 @ 5 GPA; $15.00 @ 10 GPA; $16.00 @ 15 GPA

FERTILIZER AND SOIL AMENDMENTSz

Inject Liquid Fertilizer into Irrigation System

Hour

28.00

35.00

32.06

Truck plus labor

Inject Liquid Fertilizer into Irrigation System Acre

2.00

3.50

2.85

$66.67/irrigation injection hookup

Liquid Boom Application

(double boom)

Acre

12.00

15.00

13.83

$14.25/acre average per single boom

Dry (bulk)

Acre

7.50

10.50

8.27

$30.00/hour

Lime or Dolomite

Acre

7.50

9.75

8.38

Lime or Dolomite

Ton

7.50

9.50

8.08

Fertilize Treesz

Hand spread

Hour

10.00

15.00

12.13

Plus transportation and materials

Machine spread

Hour

25.00

32.00

29.36

Plus materials; $8.83/acre

IRRIGATION

Microsprinkler

$3.42/acre, $37.50/month, $18.00/trip

Start/stop & supervision

(truck & driver)

Microsprinkler

Hour

25.00

35.00

28.75

Start/stop & supervison

(truck & driver)

Freeze Protect

w/ Irrigation

$45.00/night/system; $25.00/night/system -- monitor weather & employee standby

ATV w/ Driver

Hour

15.00

25.00

20.65

Check/repair microsprinkler

irrigation system

Ring Young Trees

Hand labor Hour

10.00

15.00

12.13

Labor plus equipment
Mechanical Hour

24.20

28.50

26.81

Ditch mower Hour

50.00

REMOVING TREES

Tree Shearing (cutting trees at ground level)

Hour

50.00

65.00

56.00

5-20 trees/hour to shear trees

Front-End Loader

Hour

45.00

60.00

51.97

5-15 trees/hours to remove trees

Bulldozer

Hour

48.50

Front-End Loader

w/ Tree Spade

Hour

65.00

PRUNING

General Pruning

(Rehab)

Tree

3.00

5.00

3.81

Depends on trees/acre

Power Saw

w/ Operator

Hour

17.00

25.00

19.20

Plus transportation

Limb Lifter/Tree Skirt Timmer

(double sided)

Hour

210.00

9-18 acres per one pass

Hedging

Single side

(tractor mounted)

Hour

75.00

100.00

86.25

2-5 acres/hour

Single side

(tractor pulled)

Hour

80.00

$20/acre

Double side

(tractor mounted)

Hour

80.00

82.50

81.25

3-5 acres/hour

Double side

(tractor pulled)

Hour

210.00

Double side

(self propelled)x

Hour

325.00

360.00

339.00

10-25 acres/hour,

depending on wood size

Double Side

(self propelled)x

Hour

280.00

300.00

290.00

4-12 acres/hour,

depending on wood size

Topping

Tractor mounted

Hour

190.00

Tractor pulled

Hour

100.00

1-3 acres/hour

Self propelled

Hour

350.00

380.00

367.50

5-10 acres/hour (roof top)

5-20 acres/hour (flat top)

Self propelled

Hour

250.00

290.00

270.00

Double boom

(self propelled)

Hour

550.00

2-12 acres/hour (roof top)

15-30 acres/hour (flat top)

Removing Brush

Haul brush from

grove

Hour

40.00

$48.75/hour average

(2 people with truck/tractor)

Front-end loader

(push brush)

Hour

46.40

60.00

52.40

2-10 acres/hour

Chop/mow brush

Hour

26.00

37.50

30.62

3-6 acres/hour, $9.85/acre average

COLD PROTECTION

Mechanical

Hour

23.43

Install Wraps

Hour

0.25

0.50

0.37

OTHER CUSTOM RATES

Plant Tree Resets

Tree

1.75

2.50

2.29

Stake, plant, and first watering

Solid Set Planting

Tree

1.10

1.50

1.19

Stake, plant, and first watering

Travel/Set-Up Charge

Hour

27.00

Reporting average
Grove Management Charge/Month

Supervising grove

care operations

Acre

1.50

5.50

2.70

In addition to caretaking charges

Handling fruit

marketing

Box

0.10

0.25

0.15

6% equipment labor charge;

$50/acre annually

Chemical/fertilizer management

10-25% of materials cost

Personnel charges

$0.05-$0.18/box (harvesting operations/labor compliance records)
Consulting $50-$100/hour (cultural management/ horticultural evaluation/ financial analysis prospectus)
Total Reported Acreage Provided Grove

Service to

Acre

350

14,122

2,639

60,708 acres total

Source: Ronald P. Muraro, professor, Citrus Research and Education Center, Lake Alfred, FL. June 2002.

z Plus materials. Caretakers reporting rates include labor, tractor, and sprayer. Supply truck included

by most caretakers.

y Calculated by dividing total caretakers reporting a grove practice rate into sum reported. Unless otherwise

stated, labor included with all charges.

x Low acres = two years regrowth hedging; high acres = annual maintenance hedging.

Table 2. 

A listing of 2002 custom rates reported by 22 Indian River and South Florida citrus caretakers.

Grove Practice

Unit

Range of Rate Reported

Average Ratey

Comments

CULTIVATION AND EQUIPMENT

Hand Labor

Hour

$ 11.50

$ 13.75

$ 12.46

Plus transportation and equipment

Mechanic Labor

Hour

25.00

40.00

34.33

Labor and service truck

Rotovate

Hour

30.00

40.00

33.76

Disc 7-8 feet

Hour

25.00

35.00

29.33

Disc 10 feet

Hour

31.00

35.00

32.33

Mow (Off-set

or side mower)

Hour

29.00

35.00

32.25

Mow 7-8 feet

Hour

29.50

33.00

30.29

Mow 7-8 feet

Acre

8.00

10.00

9.06

Mow 9-10 feet

Hour

30.00

35.00

31.91

Mow 9-10 feet

Acre

8.00

10.50

9.17

Mow 15-16 feet

Hour

35.00

41.00

36.78

$8.25/acre average

V-Mower

Hour

30.00

34.00

32.22

$8.75/acre average

Sickle Mower

Hour

30.00

35.00

32.40

Herbicide (strip/ band single boom)z

Hour

32.00

38.00

35.00

Herbicide (strip/ band single boom)z

Acre

11.00

12.50

12.19

Plus materials

Herbicide (strip/ band double boom)z

Acre

12.00

12.50

12.19

Plus materials; $35.41/hour average

Herbicide (chemical mow)z

Acre

3.00

7.00

4.42

Plus materials

Temikz

Acre

11.00

13.50

12.17

Plus materials

Plow

Hour

30.00

35.00

31.58

Backhoe

Hour

41.00

60.00

46.20

Vine Puller

Hour

29.00

30.00

29.50

Middle Buster

Hour

29.50

35.00

31.92

With tractor and driver; $0.2/foot

Mound Builder

Hour

33.00

35.00

33.67

With tractor and driver; $0.25/mound
Grader Blade Hour

28.00

35.00

31.30

With tractor/blade and driver

Caterpillar Grader

Hour

55.00

Bush Hog

Hour

30.00

41.00

32.13

Water Truck

w/ Driver

Hour

27.00

35.00

30.88

Pickup Truck

w/ Driver

Hour

21.50

32.00

27.73

24,970 miles/year/pickup average
Flatbed Truck w/Driver Hour

28.50

40.00

35.70

12,115 miles/year/transport truck average

Tractor w/ Driver

Hour

27.00

35.00

29.40

ATV w/ Driver

Hour

17.50

30.00

22.16

SPRAYINGz

Hand Sprayer

Hour

44.00

Tractor and handgun sprayer plus 2 men

AIR BLAST SPRAYER

Engine-Driven

PTO-Powered

Tree See

Technology

500 GPA

Acre

35.50

30.00

36.00

34.40

$38.48/acre PTO

250 GPA

Acre

28.00

36.00

30.50

29.00

31.00

29.40

$29.42/acre PTO

125 GPA

Acre

23.50

26.00

25.05

20.00

25.00

23.30

$25.38/acre PTO

100 GPA

Acre

19.00

19.75

19.42

Curtec (25 GPA)

Acre

18.00

20.00

19.33

Aerial

Fixed Wing $4.38/acre @ 5 GPA

Aerial

Fixed Wing $6.08/acre @ 10 GPA; Huey Helicopter $12.25/acre @ 10 GPA

Aerial

Fixed Wing $7.67/acre @ 15 GPA; Huey Helicopter $16.00/acre @ 15 GPA

Aerial

Fixed Wing $10.33/acre @ 20 GPA; Huey Helicopter $21.00/acre @ 20 GPA;

Huey (Aquatic) $30.00/acre @ 20 GPA

FERTILIZER AND SOIL AMENDMENTSz

Liquid Boom Application

Single boom

Acre

12.50

Double boom

Acre

12.25

Dry (bulk)

Acre

6.00

8.25

7.20

Lime or Dolomite

Acre

7.00

8.25

7.47

$33.26/ton (includes materials)

Fertilize Treesz

Hand spread

Hour

11.50

13.75

12.46

Plus transportation and materials

Machine spread

Hour

30.00

35.00

31.88

Plus materials; $7.54/acre average

IRRIGATION

Ditch Mower

Hour

35.00

45.00

39.00

Water Furrow Disc

Hour

29.00

40.00

33.06

Water Furrow Shaper

(non-laser)

Hour

35.00

42.00

37.33

Water Furrow Shaper

(laser control)

Hour

71.50

80.00

74.39

One reporting $0.05/foot

(drained & shaped)

Water Trencher

Hour

30.00

35.00

32.33

One reporting $0.02/foot in water furrows

Rotary Ditcher

or Auger

Hour

28.00

40.00

34.00

Water Slinger

Hour

35.00

Micropsprinrkler/

Drip Irrigation Maintenance

Acre

2.25

4.50

3.38

Check and repair system; parts extra

Microsprinkler

$27.50/setting; $32.50/hour

(truck & driver)

Start/stop and supervison (truck & driver)

REMOVING TREES

Front-End Loader

Hour

50.00

60.00

53.13

3-15 trees/hour average

Tree Shearing (cutting trees at ground level)

Hour

50.00

60.00

53.33

5-20 trees/hour average

PRUNING

General Pruning (Rehab/Freeze Damage)

Tree

3.50

Power Saw

w/ Operator

Hour

17.50

20.75

18.36

Hedging

Single side

(tractor-pulled)

Hour

55.00

Double side

(tractor-pulled)

Hour

100.00

6-10 acres/hour

Double side

(tractor

mounted)

Hour

200.00

Double side

(self propelled)

Hour

225.00

265.00

238.33

8-20 acres/hour, $14.72/acre average

Double side

rotary boom

(self propelled)x

Hour

300.00

5-15 acres/hour (bed top),

add 25% furrows only

Double side

self propelled

fixed boom

hedgerx

Hour

360.00

12-30 acres/hour (bed top)

8-20 acres/hour (bed top and furrow)

Topping

Tractor pulled

Hour

100.00

125.00

113.33

2-5 acres/hour

Tractor pulled

Hour

365.00

5-12 acres/hour (roof top)

10-20 acres/hour (flat top)

Double side

topper (self

propelled)

Hour

210.00

265.00

237.50

8-15 acres/hour, $27/acre

Double boom

(self propelled)

Hour

550.00

15-30 acres/hour (flat top)

Double side

(self propelled)

Hour

$32.63/acre (gable);

$23.13/acre (flat top)

Limb Lifter/

Tree Skirt

Trimmer

Acre

13.50

3-5 acres/hour

Limb Lifter/

Tree Skirt

Trimmer

(single-side

rotary)

Hour

90.00

4-10 acres/hour

Limb Lifter/

Tree Skirt

Trimmer

(double-side

rotary)

Hour

160.00

6-20 acres/hour

Removing Brush

Remove brush

w/ front-end

loader

Hour

45.00

60.00

52.86

$8.00/acre average

Chop/mow

brush

Hour

30.00

40.00

33.40

OTHER CUSTOM RATES

Install Tree Wraps

$0.10-$0.25 acres/hour, depending on wrap & trees; $0.30/tree maintenance

Plant Trees

(solid set)

Tree

0.90

1.15

1.04

Varies as to density

Plant Tree (resets)

Tree

2.00

3.50

2.34

Varies as to the number of resets

Grove Management Charge/Month

Supervising

grove care

operations

Acre

3.00

6.00

4.50

In addition to caretaking charges

Handling fruit marketing

$0.05-$0.15/box; $0.05/pound-solids

($5/acre/month supervising/managing)

Chemical/fertilizer management

10-20% of materials cost

Personnel charges

$0.10/box (harvesting operations & /labor compliance records)

Consulting Hour

75.00

120.00

106.67

Horticulture Evaluation/Financial Analysis

Consulting $250/day (cultural management)

Total Reported Acreage Provided Grove

Service to

Acre

1,300

8,000

3,431

44,602 total acres

Source: Ronald P. Muraro, professor, University of Florida, Citrus Research and Education Center, Lake Alfred, FL, June 2002.

z Plus materials. Caretakers reporting rates include labor, tractor, and sprayer. Supply truck included

by most caretakers.

y Calculated by dividing total caretakers reporting a grove practice rate into sum reported. Unless otherwise

stated, labor included with all charges.

x Low acres = two years regrowth hedging; high acres = annual maintenance hedging.

Footnotes

1.

This is EDIS document FE 349, a publication of the Department of Food and Resource Economics, Florida Cooperative Extension Service, Institute of Food and Agricultural Sciences, University of Florida, Gainesville, FL. Published March 2003. Please visit the EDIS website at http://edis.ifas.ufl.edu.

2.

Ronald P. Muraro, Professor and Farm Management Economist, Department of Food and Resource Economics, Citrus Research and Education Center, Lake Alfred, FL, Florida Cooperative Extension Service, Institute of Food and Agricultural Sciences, University of Florida, Gainesville, FL.


The Institute of Food and Agricultural Sciences (IFAS) is an Equal Opportunity Institution authorized to provide research, educational information and other services only to individuals and institutions that function with non-discrimination with respect to race, creed, color, religion, age, disability, sex, sexual orientation, marital status, national origin, political opinions or affiliations. For more information on obtaining other extension publications, contact your county Cooperative Extension service.

U.S. Department of Agriculture, Cooperative Extension Service, University of Florida, IFAS, Florida A. & M. University Cooperative Extension Program, and Boards of County Commissioners Cooperating. Larry Arrington, Dean.